“Preservation in Progress” by Trish Smith

Have you ever heard us discuss our preservation philosophy at Drayton Hall and wondered what “preservation” actually entails? On the face of it, it may seem as if our decision to preserve rather than restore our historic structures means that we take a totally “hands-off” approach, but quite the opposite is true. While we are not in the business of restoring Drayton Hall, we do stay very busy maintaining this amazing place that has been entrusted to our care.

As with any house, Drayton Hall is almost always in need of some repair or another, but items related to the safety of our guests and staff always take precedence. That’s why we’ve hired an engineering firm to assess the structural integrity of the main house and portico. The information generated by the study, which begins this fall, will help us understand how best to accommodate the 50,000 visitors we receive annually. Exercising what we hope to be an over-abundance of caution, we have closed the upper portico until the conclusion of this study.

Trish Smith uses a headlamp to vacuum debris in the attic.

Guests who toured the house in February may have pondered the existence of ghosts at Drayton Hall as they listened to the footsteps, rattles, and bangs emanating from the attic. Happily, these ominous sounds were not coming from beyond the grave, but rather, were the sounds of preservation in progress. In an effort to relieve some of the weight bearing on the structure, bucket-loads of debris were carried out of the attic down the spiral staircase; 45 five-gallon bucket-loads to be exact!

As the seasons changed we emerged from the attic for some special spring cleaning. Moss and fungus that dotted the bricks and stone at Drayton Hall were scrubbed away using a mild detergent approved for use on historic masonry along with natural bristle brushes and lots of elbow grease! This work is decidedly less glamorous and more labor-intensive than other preservation projects on site, but it is an important way that we protect our historic masonry from the damaging effects of biological growth.

Stone lintel before and after cleaning to remove harmful biological growth.

Another project we’ve been working on this year is the creation of an architectural fragment collection. Sometimes failing architectural elements have to be removed from the house, but they receive just as much care after their removal as if they were still in situ. We carefully document their original location, clean them up, assign a catalog number and then store them in an archival space. This allows us to study the fragments and possibly reattach them in the future. The architectural fragment collection is another way that we preserve our historic architecture, and it’s a great way to study our architectural resources.

As you can see, our preservation philosophy keeps us quite busy behind the scenes. Drayton Hall may have an air of intransience about it, but it’s really a very dynamic place that requires constant care and attention. As always, we are immensely grateful to the Friends of Drayton Hall who help make this important work possible, and we encourage you to be on the lookout for Preservation in Progress on your next visit.

Trish Smith is the House Manager and Preservation Technician at Drayton Hall, and is also a former Wood Family Fellow. She can be contacted via email at patricia_smith@draytonhall.org.

4 thoughts on ““Preservation in Progress” by Trish Smith

  1. I’m very happy to see that the attic is getting much deserved attention. I am curious to learn about the analysis of the framing ‘anomalies’ in the attic and what additional information has been discovered concerning the chronology of changes in the roof structure.

    • Research is ongoing regarding the various components of the attic framing. We do know that there have been several adaptations to the original roof. When Drayton Hall was first constructed it had a treble or “W-shaped” roof, followed by a double-hipped roof with slate shingles, and finally the standing seam metal roof that was installed c.1880.

  2. What is the situation with the 2nd level portico? Is it really ‘pulling away’ from the house?! I was always more concerned with the condition of the structure of the deck itself. Can you tell me something about the work done to mitigate the water intrusion there? What about the 1st floor?

    I commend you and the DH preservation team for your continuing EXCELLENT work.

    • At this time, we have no evidence that the portico is pulling away from the house. However, the effects of water intrusion and incompatible modern materials have given us cause for concern regarding the structural integrity of the portico. For that reason, an engineering team is presently conducting a structural assessment, and will make recommendations to address structural deficiencies, if any. As a precaution, we have closed the second floor of the portico, but the first floor remains open.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s